
The following projects are planned for 2020. By 2020 we mean projects that we plan to complete during the off-season of 2019/2020 and be completed before the summer of 2020.
Planned for 2020 (not completed)
- Blocks for emergency steering
- Boom preventers
- Service blocks inside boom
- Stern worklight
- Third reef
- Storage, storage, storage…
- Purchase needed spares
- Complete watermaker installation
Completed in 2020
- Watermaker
- Replace stern shower
- DC breakers and MPPT’s for solar panels
- Replace all navigation lights with LED navigation lights
- Replace all lamps with LED lamps
- New cables for bow windlass
- EPIRB and PLB’s
- Satellite communication
- Replace Fire Extinguishers
- Fire alarms
- Seawater strainer for engine
- New halyard shackles
- Service winches
- Sun protection for cockpit in harbour
- Primer and new antifouling
- Cruising sails
- OSK Offshore sailing course (Jonas)
- 4G router and antenna
- Blocks on arch for dinghy
- Dyneema lifelines at gates
- New washers for chainplates
- Radar
- Radar reflector
- Bow search light
- Spare main halyard with clutch on mast
- Cutter jib halyard
- OSK Offshore sailing course (Sanna)
- Remove keel and reseal keel and hull *
- Clean heat exchanger *
- Clean diesel tank
- Arch for solar panels with davits
- 2 x 390W solar panels mounted on arch
- Handles stabilizers for aft pushpit
- Additional step on swim ladder
- New outboard holder on aft pushpit
- Adjusted track for bow anchor and chain on anchor roller
- Gate lifeline stanchions
- Sun protection for cockpit wile downwind sailing
- New life raft and life raft cradle
- New dingy and outboard
- New sailing instruments above companionway
- Cutter stay
- Sheave box for spare genua halyard and storm jib halyard
- New sheaves for main halyards
- LED steam navigation light with integrated deck light
- New holders/boxes for stern shower
- Removed old solar panel and repaired and painted gelcoat damaged by solar panel.
- New membrane bilge pump and bilge valves
- New dorado boxes
Completed in 2019 but was planned for 2020
- Scrape, sand and remove old antifouling
- Three additional coats of epoxi on hull
- Upgraded network from SeaTalk1 to SeaTalkNG
- Replaced speed and temperature transducer
- ITC-5 for conversion of transducer data to SeaTalkNG / NMEA 2000
- New Raymarine Evolution autopilot, old kept as spare
- World Sailing Personal Survival training (Jonas)
- World Sailing Personal Survival training (Sanna)
- New rubber seal for S-drive and lower seal rings
- New vacuum valve for engine
- New alternator and alternator regulator
* Gustavsbergs Marincenter