Ongoing projects 2019 / 2020

The following projects are planned for 2020. By 2020 we mean projects that we plan to complete during the off-season of 2019/2020 and be completed before the summer of 2020.

Planned or ongoing for 2020

  • OSK Offshore sailing course (Jonas)
  • Watermaker
  • Replace stern shower
  • DC breakers and MPPT’s for solar panels
  • Replace all navigation lights with LED navigation lights
  • Replace all lamps with LED lamps
  • New cables for bow windlass
  • 4G router and antenna
  • EPIRB and PLB’s
  • Satellite communication
  • Replace Fire Extinguishers
  • Fire alarms
  • Seawater strainer for engine
  • Blocks on arch for dinghy
  • Blocks for emergency steering
  • Boom break and preventer
  • Additional main halyard
  • Dyneema lifelines at gates
  • New washers for chainplates
  • Service blocks inside boom
  • New halyard shackles
  • Service winches
  • Radar
  • Radar reflector
  • Sun protection for cockpit in harbour
  • Primer and new antifouling
  • Cruising sails
  • Storage, storage, storage…
  • Purchase needed spares
  • Additional fridge/freezer (if needed???)

Completed in 2020

  • OSK Offshore sailing course (Sanna)
  • Remove keel and reseal keel and hull *
  • Clean heat exchanger *
  • Clean diesel tank
  • Arch for solar panels with davits
  • 2 x 390W solar panels mounted on arch
  • Handles stabilizers for aft pushpit
  • Additional step on swim ladder
  • New outboard holder on aft pushpit
  • Adjusted track for bow anchor and chain on anchor roller
  • Gate lifeline stanchions
  • Sun protection for cockpit wile downwind sailing
  • New life raft and life raft cradle
  • New dingy and outboard
  • New sailing instruments above companionway
  • Cutter stay
  • Sheave box for spare genua halyard and storm jib halyard
  • New sheaves for main halyards
  • LED steam navigation light with integrated deck light
  • New holders/boxes for stern shower
  • Removed old solar panel and repaired and painted gelcoat damaged by solar panel.
  • New membrane bilge pump and bilge valves
  • New dorado boxes

Completed in 2019 but was planned for 2020

  • Scrape, sand and remove old antifouling
  • Three additional coats of epoxi on hull
  • Upgraded network from SeaTalk1 to SeaTalkNG
  • Replaced speed and temperature transducer
  • ITC-5 for conversion of transducer data to SeaTalkNG / NMEA 2000
  • New Raymarine Evolution autopilot, old kept as spare
  • World Sailing Personal Survival training (Jonas)
  • World Sailing Personal Survival training (Sanna)
  • New rubber seal for S-drive and lower seal rings
  • New vacuum valve for engine
  • New alternator and alternator regulator

* Gustavsbergs Marincenter


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s